-
E-mail
czsmdryer@163.com
-
Phone
18861236698
-
Address
Zhenglu Industrial Park, Changzhou City, Jiangsu Province
Jiangsu Shengman Technology Engineering Co., Ltd
czsmdryer@163.com
18861236698
Zhenglu Industrial Park, Changzhou City, Jiangsu Province
Closed circuit circulating cyclone crushing spray drying tower 70Kg
Dry materials: solid materials;
Disposal method: Closed loop circulation cyclone crushing and drying (using nitrogen as the drying medium); Drying capacity: 30Kg/hour; Evaporation capacity: 70Kg/hour; Feed moisture content: 70%~80%; Material specific gravity: 10.1; Particle size: 1mm~5mm; Steam temperature: 151.96C Oxygen content:<2.0%;
Dry final moisture content: 10-12%;
System airtightness: Level 2 (according to the national standard for controlled atmosphere storage);
Heating source: main heating source saturated steam (steam pressure>0.6Mpa), electric heating tube assisted temperature control heating; Installed power:>30KW+infrared heating tube>2KW; material: 316L stainless steel (except for motor and reducer)
1. It should be able to display and record the operating status and process parameters in real time (inlet air temperature and humidity, bed temperature, outlet air temperature, spray volume, air volume, pressure difference). Capable of storing product process parameters.
2. The export can be equipped with temperature and humidity sensors, which can be linked to the online monitoring and control of key parameters of the entire system, achieving online monitoring of air intake status, compressed air status, liquid intake status, and outlet status. Set up system warning and alarm functions based on the export temperature and humidity status, and establish a drying warning line.
1. The entire system realizes online blowing and online cleaning (CIP), including movable cleaning machines, 304 stainless steel storage tanks (1000L), cleaning nozzles (according to the corresponding number of equipment matching), etc. The water outlet pipeline of the cleaning machine is connected to the main equipment cleaning pipeline and cleaned from top to bottom through PLC control. The pipeline connection adopts sanitary grade quick card connection and is sealed with silicone rubber sealing gasket.
2. The engine base, container trolley and expansion room, spray room, capture room and exhaust pipe shall be able to be cleaned online (CIP)
3. The cleaning drain of the machine base must be adapted to the cleaning rate, and the cleaning water can be drained in a timely manner
4. Cleaning pressure:>5 bar, cleaning flow rate:>60 L/min
5. Water pump: Southern (explosion-proof motor)
6. Explosion proof requirements for electrical components


